What does post-construction cleaning include?
Construction leaves fine dust, debris and residue on every surface, long after the trades pack up. We clean new builds, tenant improvements and renovated commercial spaces so they are safe, presentable and ready for inspection, handover or the first day of business.
Most projects need three stages. A rough clean removes debris and bulk dust once major work ends. A final clean details every surface before handover. A touch-up clean catches dust from last-minute fixes and deficiency repairs before tenants or staff move in.
Once the space is open, we can continue with recurring commercial cleaning, so the team that prepared the building already knows its finishes and layout. Handover-ready means no dust on ledges, no residue on glass and no debris in corners, ceilings or vents.
Commercial spaces bring their own challenges: large glass areas, suspended ceilings, washroom banks, commercial kitchens and warehouse floors. We size the crew to the project so the clean fits your handover date.
- Debris, packaging and leftover materials removed
- Construction dust cleared from ledges, ceilings and vents
- Windows, frames and tracks cleaned of dust and residue
- Paint, adhesive and sticker residue removed from glass and fixtures
- Washroom and kitchen fixtures detailed
- Hard floors scrubbed and carpets vacuumed
- Light fixtures, baseboards and doors wiped down
- HEPA-filtered vacuuming of fine dust
What’s included
-
Rough clean Bulk debris and dust removed after major trades finish, so work can continue safely.
-
Final clean Every surface detailed from ceiling to floor before handover or inspection.
-
Touch-up clean A last pass after deficiency repairs, furniture delivery and IT installation.
-
Fine dust control HEPA-filtered vacuums and microfibre cloths capture fine particles.
-
Glass and fixtures Windows, mirrors, sinks and hardware cleaned of residue and fingerprints.
-
Floor preparation Hard floors scrubbed and ready for finishing or first use.
-
Contractor coordination Visits booked around trade schedules and site access rules.
-
Site safety Crews follow site orientation, PPE rules and WorkSafeBC requirements on every visit.
-
Waste separation Debris bagged and moved to your designated disposal bins.
-
Supervisor walkthrough A final inspection confirms the space is ready, with gaps fixed within 48 hours.
Properties we serve
Offices & corporate buildings
Tenant improvements and office fit-outs ready for move-in day.
Retail & shopping centres
New and renovated storefronts cleaned before opening.
Healthcare & medical facilities
Clinic renovations cleaned to a standard ready for patients.
Schools & campuses
Summer renovation projects cleaned before students return.
Industrial & warehouse
New warehouse and shop spaces cleared of dust and debris.
Strata & property management
Common-area upgrades and building renovations ready for residents.
When do you schedule post-construction cleaning?
We plan cleans around your construction schedule, not ours. The rough clean usually follows drywall, painting and major trades; the final clean is booked for the days before inspection or handover; and touch-ups follow deficiency work, furniture installation or IT setup. Each stage is confirmed in writing.
Tell us the target occupancy date and we will work back from it with your general contractor or project manager. We can work evenings and weekends when trades need the space during the day, and we adjust quickly when schedules slip.
Large projects often need follow-on work, such as floor stripping and waxing for new resilient floors or exterior window cleaning once scaffolding comes down. Browse all commercial cleaning services to plan the full handover.
Book a free walkthrough or share your floor plans, and we will quote each stage separately. Request a quote and we will reply within one business day with a written scope.
How it works
Starting service is simple
-
Free site walkthrough
Tell us about your facility. We visit, confirm the scope and send a written quote.
-
Custom cleaning plan
Nightly, weekend or day porter schedules built around your operating hours.
-
Inspected & reported
Supervisor inspections, daily logs and corrective action within 48 hours.
Safety, insurance and compliance
Active construction sites carry hazards that office cleaning does not. Our crews complete site orientation, wear the personal protective equipment your site requires and follow the general contractor’s safety rules. Cleaning products are handled under WHMIS training with safety data sheets on hand.
Supervisors inspect each stage against the agreed checklist and walk the space with your site lead before handover. Anything missed is corrected within 48 hours.
- $5,000,000 commercial general liability insurance
- Bonded, uniformed staff
- Active WorkSafeBC coverage
- WHMIS-trained team members
- Supervisor inspections and daily logs
Service areas
Serving Surrey and the Lower Mainland
We prepare new and renovated commercial spaces for occupancy across Surrey, the Lower Mainland and the Fraser Valley.
FAQ
Post-construction cleaning FAQs
What is the difference between a rough clean and a final clean?
A rough clean removes debris and heavy dust once major trades finish, so remaining work can continue safely. A final clean details every surface, from light fixtures to floors, so the space is ready for inspection and handover.
Do you work with general contractors?
Yes. We coordinate directly with general contractors, project managers and site supervisors, and we follow each site’s access, sign-in and safety rules. Updates are shared with your site supervisor after each visit.
Can you clean while trades are still on site?
Yes. Rough and touch-up cleans often happen while trades are working. We plan the sequence with your site supervisor so cleaned areas stay clean. Dust-producing work nearby is flagged so we can return for a touch-up.
Do you remove construction debris?
We remove loose debris, packaging and leftover materials from the work areas and move them to your designated bins. Hauling large volumes of construction waste off site is usually arranged by the contractor.
Do you clean windows after construction?
Yes. Final cleans include interior glass, frames and tracks. For exterior or high-rise glass, we schedule commercial window cleaning once scaffolding and lifts are gone. Glass is checked again during the touch-up clean.
Are your crews insured for construction sites?
Yes. We carry $5,000,000 commercial general liability insurance, are bonded and have active WorkSafeBC coverage. Crews are WHMIS-trained and follow site-specific safety requirements.
How long does a post-construction clean take?
It depends on the size of the space, the finishes and how much dust remains. After a walkthrough we confirm crew size and timing in your written quote so you can plan the handover.
How do I get a post-construction cleaning quote?
Send us your project details or call us. We book a free walkthrough, confirm each stage and send a written quote. Rough, final and touch-up stages can be quoted separately.
Plan your post-construction clean
Share your handover date and project scope, and we will build a cleaning schedule around your trades.
